MAINTENANCE WORKS
The wind-tunnel has been cleaned up and restored and…there was light !

Maintenance work have recently conducted to restore and paint the surfaces of the ceiling and the ground of the wind-tunnel. New cablings were installed in the recording area and inside the tunnel. Safety devices were added inside the tunnel, such as new openings mechanisms and a stop button for the fan. A deep cleaning was operated too inside and outside the channel. Last but not least, two strips of LED lights cover the entire length of the tunnel.

Related Posts